Choose a stacker crane manufacturer by checking how well its engineering, equipment scope, controls, project coordination, and after-sales support fit your AS/RS requirements—not by comparing machine prices alone. Before requesting a proposal, prepare your load and pallet data, storage layout, throughput target, operating conditions, and required system interfaces. At HEGERLS, we recommend using these details to clarify the boundary between the crane, racking, controls, and other material-handling equipment, so suppliers can respond to the same project scope.
This guide is for warehouse owners, logistics teams, system integrators, and procurement professionals evaluating stacker crane manufacturers for a new or upgraded automated storage and retrieval system. It is useful whether you are planning a single aisle or comparing suppliers for a wider AS/RS project. The aim is to help you define what to ask, compare proposals consistently, and identify the information needed for an informed quotation.
A stacker crane is a load-handling machine that travels within a storage aisle to place or retrieve goods from rack locations. In an AS/RS, it works as part of a wider system that may include racking, pallets or load carriers, conveyors, warehouse control software, safety equipment, and interfaces to other operations. Its suitability therefore depends on the complete system design, not on the crane in isolation.
Manufacturers may offer configurations for different load types, aisle layouts, storage heights, and operating requirements. A project may use pallet-handling equipment, while another requires equipment designed around smaller containers or a different load carrier. Ask each supplier to identify the proposed configuration and explain which project inputs informed that choice.
Also clarify whether the proposal covers a single-deep or multi-deep storage arrangement, the number of aisles, and how loads are transferred into and out of the storage area. These choices can affect access, equipment requirements, and the control logic. Do not assume that two proposals are comparable simply because both describe a stacker crane.
Start by defining the goods and the work the AS/RS must perform. Document the dimensions, gross weight, stability, and condition of each load type, along with the pallet or carrier specifications. Include the expected range of variation, because a system designed around a nominal load may not be suitable for every load it will encounter.
Next, describe the operating context: available building space, aisle arrangement, storage height, temperature or environmental conditions, and the movement of goods into and out of the system. Separate peak demand from normal operating demand, and state how you calculate throughput. A clear description helps manufacturers identify assumptions instead of silently designing around different interpretations.
The figures below are illustrative inputs for an RFQ, not HEGERLS product specifications or universal design recommendations. For example, a project team might use a 1,000 kg gross load, a 12 m storage height, and a target of 40 pallets per hour to show the type of data a supplier needs. Your actual limits and targets must come from the goods, facility, operating plan, and system-level engineering.
Ask each manufacturer to state the proposed crane configuration, design assumptions, load limits, travel and lifting requirements, and any operating constraints relevant to your layout. Request a clear list of included and excluded equipment, including the boundaries for racks, conveyors, electrical work, controls, and installation. If a requirement is not yet confirmed, ask the supplier to mark it as an open point rather than present it as settled.
Clarify how the crane is expected to communicate with the warehouse control or management system and what information must be exchanged. Identify who is responsible for interface definition, commissioning coordination, and resolving issues across equipment supplied by different parties. Ask how safety functions, operating procedures, and site-specific requirements will be addressed, and have the responsible project professionals verify applicable requirements.
A capable supplier should be able to explain its design process, required customer inputs, review stages, and project responsibilities. Ask who will coordinate technical questions and how changes to the building, load profile, or throughput target affect the proposal. Review drawings and interface documents with your project team before treating a quotation as a final, comparable offer.
HEGERLS are exported all over the world and different industries with quality first. Our belief is to provide our customers with more and better high value-added products. Let's create a better future together.
Ask what commissioning support, operating documentation, maintenance information, training, and spare-parts guidance are available for the proposed scope. Confirm the service territory, response process, and any conditions or exclusions in writing. Avoid treating general statements such as “full support” as a defined commitment unless the proposal explains what that support includes.
There is no reliable universal price or lead time for a stacker crane project. The commercial offer depends on the equipment configuration, project scope, customization, controls and integration requirements, installation responsibilities, and delivery conditions. Ask suppliers to separate equipment costs from engineering, integration, installation, commissioning, and optional services where applicable.
For minimum order quantities, confirm whether the supplier can quote a single-crane or single-aisle project and whether any parts of the scope have minimum production or purchasing conditions. For lead time, request the assumptions behind the schedule, including when approved drawings, technical data, and customer decisions are required. Compare milestone definitions and exclusions rather than relying on an unqualified calendar estimate.
Use a shared checklist so every candidate answers the same questions. A written response makes gaps easier to identify and helps your team distinguish confirmed scope from assumptions. The following points are a practical starting place for supplier discussions.
One frequent mistake is selecting a supplier using only a headline price, without comparing what is included. Another is providing a single nominal load while omitting pallet variation, load condition, or peak operating requirements. These gaps can create different design assumptions and make proposals difficult to compare.
It is also risky to treat the crane as a standalone purchase when the project depends on rack geometry, transfers, controls, and building conditions working together. Confirm interface ownership early, especially when multiple suppliers are involved. Finally, do not accept performance, compliance, or service claims without asking for the scope, assumptions, and supporting project documentation behind them.
As a storage and racking supplier, HEGERLS can discuss how the storage structure and stacker crane scope need to be coordinated within an AS/RS project. We encourage buyers to share the layout, load-carrier details, operating targets, and equipment interfaces at the beginning of the conversation. This gives both sides a clearer basis for defining requirements and identifying questions that need engineering review.
When you contact HEGERLS, include the project location, facility drawings if available, load dimensions and weights, storage concept, target throughput, project timeline, and the scope you expect the supplier to cover. If some details are not final, label them as preliminary. We can then review the available information, clarify the required scope, and discuss the appropriate next steps for a project-specific proposal.
The right stacker crane manufacturer is the one that can demonstrate a clear fit between its proposed equipment and your complete AS/RS requirements. Compare technical assumptions, system interfaces, responsibilities, service scope, and commercial terms alongside price. Treat illustrative figures as examples only and have project-specific design requirements validated by the responsible technical team.
To move forward, prepare a concise RFQ with load data, layout, operating targets, environmental conditions, and interface expectations, then send the same information to each candidate. Ask each supplier to document inclusions, exclusions, open questions, and schedule dependencies. HEGERLS welcomes project inquiries from buyers seeking to evaluate storage and stacker crane solutions for an AS/RS installation.