What Information Is Needed to Quote a Custom Fabricated Steel Truss?
To quote a custom fabricated steel truss, we need its intended use, overall dimensions, design loads, material requirements, connection details, finish, order quantity, and delivery location. A dimensioned drawing or preliminary sketch is the best starting point, but it should be accompanied by the project’s applicable design criteria and any required standards. If some details are not yet confirmed, tell us what is provisional so we can identify assumptions rather than treat them as final specifications. Complete information helps us assess fabrication scope, identify missing engineering inputs, and prepare a more useful quotation.
Please visit our website for more information on this topic.
Quick Summary: What to Include in Your RFQ
- Application and location: Explain what the truss will support and where it will be installed.
- Geometry: Provide span, depth, overall width, panel layout, and a drawing or sketch.
- Loads and design basis: Share loads, load combinations if available, governing code, and the responsible design engineer’s requirements.
- Fabrication requirements: Specify material, connections, tolerances, welding requirements, and surface protection.
- Commercial and delivery details: State quantity, requested schedule, delivery destination, and whether packing or installation support is needed.
Project Details That Shape the Quote
1. Application, Installation Location, and Operating Conditions
Start by describing the truss’s function: for example, whether it forms part of a roof, canopy, platform, equipment support, or another structure. Tell us where it will be installed, including the country or region, because the location may affect the applicable design code, environmental exposure, transport planning, and documentation requirements. Also describe relevant conditions such as indoor or outdoor use, moisture, corrosive exposure, temperature, or contact with process materials. These details help us understand the service environment without assuming that one finish or material is suitable for every project.
2. Dimensions, Shape, and Drawing Information
Provide the overall span, truss depth, width, end conditions, and the location of supports or bearing points. Include the positions and spacing of web members, chord details, openings, camber requirements, and any interfaces with columns, beams, equipment, or adjacent structures. A dimensioned PDF, CAD file, or clear marked-up sketch can help communicate the intended configuration; identify the units and revision on every document. For scale, an RFQ might identify a 12 m span and 1.5 m truss depth, but those figures are examples only and are not design recommendations.
If the design is still developing, send the current layout and list the dimensions that may change. Tell us whether the submitted drawing is for quotation, fabrication, or construction, and identify which document governs if files conflict. This reduces the risk of pricing a superseded arrangement or interpreting a preliminary concept as an approved-for-fabrication design.
3. Loads, Codes, and Engineering Responsibility
A truss cannot be quoted accurately from span alone. Provide the required dead, live, wind, snow, seismic, equipment, or other project loads as applicable, along with load locations and combinations when they are available. State the governing building or project code, design criteria, and any specified deflection or vibration limits. If a licensed or otherwise designated project engineer is responsible for structural design approval, make that responsibility and the required deliverables clear.
Distinguish between a request for fabrication to an approved design and a request that includes design or engineering services. Do not ask a fabricator to infer missing design loads from a sketch. If calculations, stamped drawings, or independent review are required, identify those requirements in the RFQ so the scope can be confirmed before pricing.
Material, Connections, and Fabrication Requirements
4. Steel Grade and Member Specifications
Specify the required steel grade or governing material standard if it has already been selected. If you do not have a material specification, share the project requirements and ask the supplier to identify possible options for engineering review rather than treating a suggested grade as automatically approved. Where applicable, note requirements for material traceability, mill certificates, or other documents. The quote should make clear which material requirements are included and which still need confirmation.
5. Connections, Welding, and Tolerances
Identify whether the truss needs bolted, welded, or mixed connections, and provide connection drawings or interface details where available. Include bolt size and grade, hole patterns, end plates, cleats, erection splices, and any field-welding restrictions specified by the design. State dimensional and fabrication tolerances, weld acceptance requirements, and inspection or documentation expectations if the project documents define them. These requirements can affect material use, shop operations, inspection scope, and the final price.
If you want to learn more, please visit our website Hengfang Machinery.
6. Coating, Corrosion Protection, and Appearance
Describe the required surface preparation and protective finish, such as a specified paint system, galvanizing, or another coating, if required by the project. Share the coating standard, color, target thickness, or preparation level only when these are defined in the specification. Explain whether visible surfaces have appearance requirements and whether masking or uncoated areas are needed at connections. If the finish is undecided, provide the exposure conditions and ask for options to be priced as clearly separated alternatives.
Quantity, Schedule, Delivery, and Commercial Scope
7. Quantity, Packaging, and Delivery Destination
State the number of trusses required and whether the order is for a single project, repeat production, or phased delivery. Even a request for 1 unit versus 20 units can change how a supplier evaluates setup, production planning, and packaging, so identify the actual quantity and any expected follow-on demand. Provide the delivery city, country, site access constraints, and preferred shipping terms if known. Also say whether you need export packing, item marking, lifting points, or delivery in erection sequence.
8. Schedule and Requested Deliverables
Give the target date for quotation, drawing approval, dispatch, and arrival if each is known. Separate a firm required date from a preferred date, and mention any approval steps that must happen before fabrication. List the documents needed with the shipment, such as approved drawings, inspection records, material documents, or packing lists, subject to the project’s requirements. A supplier can only assess schedule expectations responsibly after reviewing scope, quantity, approvals, and shipping destination.
RFQ Checklist for a Faster, Clearer Quote
| Information to send | What it clarifies | If it is not yet available |
|---|---|---|
| Application and installation location | Use, environment, and project context | Describe the intended use and known exposure conditions |
| Dimensioned drawing and revision | Geometry, interfaces, and fabrication scope | Send a sketch with confirmed and provisional dimensions marked |
| Loads, code, and design criteria | Structural design basis and approval scope | Identify who will provide or approve the final design |
| Material, connections, coating, and tolerances | Specifications, processes, and inspection requirements | Ask for separately identified options, subject to approval |
| Quantity, schedule, and delivery destination | Production planning, packing, and logistics scope | Provide an estimated quantity and target dates, labeled as estimates |
Common RFQ Mistakes to Avoid
- Sending only a span: Span does not define loads, depth, support conditions, or connection design.
- Leaving out drawing status: A preliminary sketch should not be mistaken for an approved fabrication drawing.
- Using unclear units or revisions: Mark dimensions and identify the current document revision to prevent interpretation errors.
- Omitting finish and inspection requirements: These can change the fabrication and delivery scope.
- Requesting a fixed delivery date without project context: Share quantity, approval timing, and destination so schedule feasibility can be assessed.
When details are missing, label them as “to be confirmed” and ask the supplier to list pricing assumptions and exclusions. This makes it easier to compare quotations on an equivalent scope and reduces the chance that a low initial price excludes required work. Before placing an order, resolve all engineering, material, connection, coating, and drawing-approval items that affect the finished truss.
How Hengfang Machinery Can Support Your RFQ
At Hengfang Machinery, we can review the project information you provide and clarify the fabrication scope, material and finish requirements, drawing interfaces, packaging, and delivery expectations. When a drawing or specification is incomplete, we can identify open questions for discussion rather than silently filling in design assumptions. Our quotation can be based on an approved design or on a clearly defined scope that still requires engineering confirmation, depending on the project requirements. Any design responsibility, inspection documentation, or special compliance deliverable should be confirmed explicitly before order placement.
For a useful first review, send your drawing or sketch, application, estimated quantity, required material or finish, project location, and target schedule. Include the governing design criteria and connection details whenever available. If you are still defining the project, tell us which items are confirmed and which need supplier input.
Conclusion: Send the Design Basis Along with the Dimensions
To receive a meaningful quote for a custom fabricated steel truss, provide more than its size: include its application, location, geometry, loads and design basis, material, connections, finish, tolerances, quantity, schedule, and delivery destination. A clear drawing with a revision and units is the most practical starting point, while a list of open items helps prevent incorrect assumptions. Share the current project package with Hengfang Machinery to discuss fabrication scope and identify what still needs confirmation. Clear inputs give both buyer and supplier a stronger basis for reviewing price, scope, and next steps.